Skip to content

Services

Seven modules. Fixed scope. Shop-floor first.

Every engagement starts with what is actually happening on your line, then works back to the certificate, the cost and the contract.

Module 01

Third-Party Inspection (TPI)

Benefits

  • Independent eyes on every critical lot before dispatch
  • Supplier audits that expose process risk, not just paperwork
  • Photo-backed reports your customer will accept

Timeline: Booked within 3–5 working days; report in 24 hours

Scope and fees discussed on a short call

6-step roadmap

  1. 1Scope call: parts, drawings, AQL and criticality
  2. 2Inspection plan and checklist agreed in writing
  3. 3On-site or supplier-site inspection visit
  4. 4Measurement, sampling and defect classification
  5. 5Report issued within 24 hours with evidence
  6. 6Corrective action follow-up and re-inspection

Case snippet

A Sanand wiring-harness supplier cut customer line rejections by 62% in one quarter after weekly pre-dispatch TPI.

FAQs

Module 02

IATF 16949 & ISO Certification

Benefits

  • Certification scope built around OEM contract requirements
  • Core Tools capability transferred to your own team
  • Zero major non-conformities at stage 2 as the target

Timeline: IATF 6–12 months · ISO 3–5 months

Scope and fees discussed on a short call

6-step roadmap

  1. 1Gap analysis against IATF 16949 / ISO 9001 clauses
  2. 2Process mapping, turtle diagrams and risk register
  3. 3Documentation: quality manual, procedures, control plans
  4. 4Core Tools training: APQP, PPAP, FMEA, MSA, SPC
  5. 5Internal audit and management review cycle
  6. 6Certification-body audit support and NC closure

Case snippet

An Ahmedabad Tier-2 supplier reached IATF 16949 certification in eight months and signed a ₹2.5 Cr OEM contract.

FAQs

Module 03

Costing Estimation & COPQ Reduction

Benefits

  • Component costing estimation summaries prepared on your behalf
  • A real number for scrap, rework, sorting and warranty
  • Priorities ranked by rupees, not by opinion
  • Savings tracked monthly against a baseline

Timeline: Baseline in 2–3 weeks · Savings visible in 8–12 weeks

Scope and fees discussed on a short call

6-step roadmap

  1. 1Drawing, process and volume review for the components in scope
  2. 2Should-cost estimation summary: material, process, overhead, margin
  3. 3COPQ model built per part family and process
  4. 4COPQ baseline: scrap, rework, warranty and sorting cost
  5. 5Pareto and loss-tree analysis of top cost drivers
  6. 6Structured problem solving (8D / A3) on the top three
  7. 7Monthly savings review and standardisation

Case snippet

An appliance components MSME in Rajkot cut COPQ from 4.1% to 2.4% of turnover within five months.

FAQs

Module 04

ZED Certification (MSME)

Benefits

  • Up to 80% subsidy on certification cost
  • Access to handholding and testing grants up to ₹5 lakh
  • Bronze → Silver → Gold path aligned with export ambitions

Timeline: Bronze 4–8 weeks · Silver 3–4 months · Gold 5–8 months

Scope and fees discussed on a short call

6-step roadmap

  1. 1Eligibility and subsidy-rate check (category + ownership)
  2. 2Udyam and ZED portal registration and pledge
  3. 3Bronze self-assessment and evidence pack
  4. 4Gap closure on the applicable ZED parameters
  5. 5Assessment booking and on-site assessor support
  6. 6Subsidy and handholding-grant claim filing

Case snippet

A Vadodara machining MSME reached ZED Gold in seven months and used the grant to fund in-house testing equipment.

FAQs

Module 05

Recruitment Consulting

Benefits

  • Candidates screened against automotive and appliance shop-floor reality
  • Quality, manufacturing, NPD and supplier-development roles covered
  • Technical evaluation done by a practising auditor, not a generalist recruiter

Timeline: Shortlist in 2–3 weeks · Typical closure 4–8 weeks

Scope and fees discussed on a short call

6-step roadmap

  1. 1Role scoping: process, products, customers and competency profile
  2. 2Compensation and market availability reality check
  3. 3Sourcing from the automotive and appliance talent pool
  4. 4Technical screening on Core Tools, systems and shop-floor exposure
  5. 5Shortlist with written evaluation notes for each candidate
  6. 6Interview support, offer guidance and 90-day follow-up

Case snippet

An Ahmedabad appliance manufacturer filled a QA Head vacancy in five weeks after a nine-month search with two agencies.

FAQs

Module 06

Supplier Development Services

Benefits

  • Supplier capability assessed on the shop floor, not on self-declarations
  • Development roadmaps that lift suppliers to OEM audit standards
  • Fewer line rejections, PPAP delays and emergency sortings

Timeline: Assessment in 2–3 weeks · Development cycle 3–6 months

Scope and fees discussed on a short call

6-step roadmap

  1. 1Supplier base assessment and risk classification
  2. 2On-site process audit of priority suppliers (VDA 6.3 style)
  3. 3Development roadmap per supplier: gaps, actions, owners
  4. 4Core Tools and quality-system coaching at the supplier
  5. 5Re-audit and capability verification against targets
  6. 6Performance monitoring handover to your SQ team

Case snippet

A Rajkot casting supplier cleared its customer's VDA 6.3 audit at B-level after a four-month development programme, retaining a ₹1.8 Cr annual order.

FAQs

Module 07

Digital & Automation Services

Benefits

  • Low-cost automation on the shop floor: data capture, alerts, digital checklists and dashboards
  • Office workflow automation that removes re-typing between registers, spreadsheets and email
  • Website, SEO, social media and campaign management under one roof
  • Sales lead generation built around the buyers of automotive and appliance components

Timeline: Quick wins in 2–4 weeks · Full programme over 3–6 months

Scope and fees discussed on a short call

6-step roadmap

  1. 1Walkthrough of shop-floor and office processes to find manual effort
  2. 2Automation and digital roadmap ranked by effort and payback
  3. 3Quick wins first: digital data capture, alerts and reporting
  4. 4Web presence: website build or refresh, SEO and local search setup
  5. 5Social media and campaign calendar started with your team
  6. 6Monthly lead and automation-performance review, then scale-up

Case snippet

A Sanand auto-component unit replaced paper production registers with digital capture and started receiving buyer enquiries through its new website within two months.

FAQs