Skip to content

Services

Eight modules. Fixed scope. Shop-floor first.

Every engagement starts with what is actually happening on your line, then works back to the certificate, the cost and the contract.

Module 01

Third-Party Inspection (TPI)

Benefits

  • Independent eyes on every critical lot before dispatch
  • Supplier audits that expose process risk, not just paperwork
  • Photo-backed reports your customer will accept

Timeline: Booked within 3–5 working days; report in 24 hours

Scope and fees discussed on a short call

6-step roadmap

  1. 1Scope call: parts, drawings, AQL and criticality
  2. 2Inspection plan and checklist agreed in writing
  3. 3On-site or supplier-site inspection visit
  4. 4Measurement, sampling and defect classification
  5. 5Report issued within 24 hours with evidence
  6. 6Corrective action follow-up and re-inspection

Case snippet

A Sanand wiring-harness supplier cut customer line rejections by 62% in one quarter after weekly pre-dispatch TPI.

FAQs

Module 02

IATF 16949 & ISO Certification

Benefits

  • Certification scope built around OEM contract requirements
  • Core Tools capability transferred to your own team
  • Zero major non-conformities at stage 2 as the target

Timeline: IATF 6–12 months · ISO 3–5 months

Scope and fees discussed on a short call

6-step roadmap

  1. 1Gap analysis against IATF 16949 / ISO 9001 clauses
  2. 2Process mapping, turtle diagrams and risk register
  3. 3Documentation: quality manual, procedures, control plans
  4. 4Core Tools training: APQP, PPAP, FMEA, MSA, SPC
  5. 5Internal audit and management review cycle
  6. 6Certification-body audit support and NC closure

Case snippet

An Ahmedabad Tier-2 supplier reached IATF 16949 certification in eight months and signed a ₹2.5 Cr OEM contract.

FAQs

Module 03

Costing Estimation & COPQ Reduction

Benefits

  • Component costing estimation summaries prepared on your behalf
  • A real number for scrap, rework, sorting and warranty
  • Priorities ranked by rupees, not by opinion
  • Savings tracked monthly against a baseline

Timeline: Baseline in 2–3 weeks · Savings visible in 8–12 weeks

Scope and fees discussed on a short call

6-step roadmap

  1. 1Drawing, process and volume review for the components in scope
  2. 2Should-cost estimation summary: material, process, overhead, margin
  3. 3COPQ model built per part family and process
  4. 4COPQ baseline: scrap, rework, warranty and sorting cost
  5. 5Pareto and loss-tree analysis of top cost drivers
  6. 6Structured problem solving (8D / A3) on the top three
  7. 7Monthly savings review and standardisation

Case snippet

An appliance components MSME in Rajkot cut COPQ from 4.1% to 2.4% of turnover within five months.

FAQs

Module 04

ZED Certification (MSME)

Benefits

  • Up to 80% subsidy on certification cost
  • Access to handholding and testing grants up to ₹5 lakh
  • Bronze → Silver → Gold path aligned with export ambitions

Timeline: Bronze 4–8 weeks · Silver 3–4 months · Gold 5–8 months

Scope and fees discussed on a short call

6-step roadmap

  1. 1Eligibility and subsidy-rate check (category + ownership)
  2. 2Udyam and ZED portal registration and pledge
  3. 3Bronze self-assessment and evidence pack
  4. 4Gap closure on the applicable ZED parameters
  5. 5Assessment booking and on-site assessor support
  6. 6Subsidy and handholding-grant claim filing

Case snippet

A Vadodara machining MSME reached ZED Gold in seven months and used the grant to fund in-house testing equipment.

FAQs

Module 05

Recruitment Consulting

Benefits

  • Candidates screened against automotive and appliance shop-floor reality
  • Quality, manufacturing, NPD and supplier-development roles covered
  • Technical evaluation done by a practising auditor, not a generalist recruiter

Timeline: Shortlist in 2–3 weeks · Typical closure 4–8 weeks

Scope and fees discussed on a short call

6-step roadmap

  1. 1Role scoping: process, products, customers and competency profile
  2. 2Compensation and market availability reality check
  3. 3Sourcing from the automotive and appliance talent pool
  4. 4Technical screening on Core Tools, systems and shop-floor exposure
  5. 5Shortlist with written evaluation notes for each candidate
  6. 6Interview support, offer guidance and 90-day follow-up

Case snippet

An Ahmedabad appliance manufacturer filled a QA Head vacancy in five weeks after a nine-month search with two agencies.

FAQs

Module 06

Supplier Audits

Benefits

  • VDA 6.3 style process audits scored against real shop-floor evidence
  • Pre-award and re-qualification audits before you place volume business
  • Risk-ranked findings with owners, dates and verified closure
  • Audit reports written in the format your OEM customer expects

Timeline: Audit booked in 1–2 weeks · Report in 3 working days

Scope and fees discussed on a short call

6-step roadmap

  1. 1Audit scope: supplier list, part criticality and audit type
  2. 2Checklist build: VDA 6.3, IATF 16949, product or process specific
  3. 3On-site audit with process walk, records review and interviews
  4. 4Scored report with risk classification and photographic evidence
  5. 5Corrective action plan reviewed and challenged with the supplier
  6. 6Closure verification or re-audit against the agreed target score

Case snippet

A Halol Tier-1 audited eight sub-suppliers in six weeks and stopped two high-risk sources before a new model launch.

FAQs

Module 07

Supplier Development Services

Benefits

  • Supplier capability assessed on the shop floor, not on self-declarations
  • Development roadmaps that lift suppliers to OEM audit standards
  • Fewer line rejections, PPAP delays and emergency sortings

Timeline: Assessment in 2–3 weeks · Development cycle 3–6 months

Scope and fees discussed on a short call

6-step roadmap

  1. 1Supplier base assessment and risk classification
  2. 2On-site process audit of priority suppliers (VDA 6.3 style)
  3. 3Development roadmap per supplier: gaps, actions, owners
  4. 4Core Tools and quality-system coaching at the supplier
  5. 5Re-audit and capability verification against targets
  6. 6Performance monitoring handover to your SQ team

Case snippet

A Rajkot casting supplier cleared its customer's VDA 6.3 audit at B-level after a four-month development programme, retaining a ₹1.8 Cr annual order.

FAQs

Module 08

Digital & Automation Services

Benefits

  • Low-cost automation on the shop floor: data capture, alerts, digital checklists and dashboards
  • Office workflow automation that removes re-typing between registers, spreadsheets and email
  • Website, SEO, social media and campaign management under one roof
  • Sales lead generation built around the buyers of automotive and appliance components

Timeline: Quick wins in 2–4 weeks · Full programme over 3–6 months

Scope and fees discussed on a short call

6-step roadmap

  1. 1Walkthrough of shop-floor and office processes to find manual effort
  2. 2Automation and digital roadmap ranked by effort and payback
  3. 3Quick wins first: digital data capture, alerts and reporting
  4. 4Web presence: website build or refresh, SEO and local search setup
  5. 5Social media and campaign calendar started with your team
  6. 6Monthly lead and automation-performance review, then scale-up

Case snippet

A Sanand auto-component unit replaced paper production registers with digital capture and started receiving buyer enquiries through its new website within two months.

FAQs