Skip to content

Service

Costing Estimation & COPQ Reduction

Component costing estimation summaries and a measured Cost of Poor Quality baseline, with structured problem solving that turns the numbers into savings.

What you get

  • Component costing estimation summaries prepared on your behalf
  • A real number for scrap, rework, sorting and warranty
  • Priorities ranked by rupees, not by opinion
  • Savings tracked monthly against a baseline

Timeline: Baseline in 2–3 weeks · Savings visible in 8–12 weeks

Scope and fees discussed on a short call

How it works

  1. 1Drawing, process and volume review for the components in scope
  2. 2Should-cost estimation summary: material, process, overhead, margin
  3. 3COPQ model built per part family and process
  4. 4COPQ baseline: scrap, rework, warranty and sorting cost
  5. 5Pareto and loss-tree analysis of top cost drivers
  6. 6Structured problem solving (8D / A3) on the top three
  7. 7Monthly savings review and standardisation

Result from the field

An appliance components MSME in Rajkot cut COPQ from 4.1% to 2.4% of turnover within five months.

FAQs

Common questions